The current architecture has a conceptual problem around:
- shots
- tasks
- versions
- approvals
- client review visibility
We need to refactor the production/review workflow so that TASKS become the true operational and review unit.
IMPORTANT: Do NOT redesign the whole app. This is a workflow/data relationship correction and cleanup.
The goal is:
- clearer production flow
- correct review behavior
- correct client review visibility
- correct kanban behavior
- proper task-based versioning
CORE ARCHITECTURAL DECISION
A SHOT is:
- a container/grouping
- a production entity
- NOT directly reviewable
A TASK is:
- the actual work unit
- the review unit
- the approval unit
- the kanban unit
- the upload/version unit
This means:
Shot
├── Track Task
│ └── Versions
│
├── Roto Task
│ └── Versions
│
└── Comp Task
└── Versions
NOT:
Shot
└── Versions
That old structure is incorrect.
REQUIRED REFACTOR
1. VERSIONS MUST BELONG TO TASKS
Currently:
Shot -> Versions
Refactor to:
Task -> Versions
A version upload must ALWAYS belong to:
- exactly one task
Remove the concept of:
- "shot latest version"
Instead:
- each task has its own latest version
Examples:
SH010
├── Track Task
│ └── latest: v003
│
├── Roto Task
│ └── latest: v005
│
└── Comp Task
└── latest: v008
This is the correct production model.
2. SHOTS SHOULD NOT DIRECTLY DRIVE CLIENT REVIEW
Currently:
- shot status = CLIENT_REVIEW
- portal shows latest uploaded version
- task context lost
This is incorrect.
Client review should be TASK-BASED.
NEW CLIENT REVIEW RULE
The client portal should display:
Tasks
where latest version is marked:
isClientVisible = true
NOT:
Shots where shot.status = CLIENT_REVIEW
This fixes:
- incorrect versions
- missing task context
- review ambiguity
CLIENT PORTAL SHOULD SHOW
Instead of:
SH010
Show:
SH010 — COMP
v008
Or:
SH010 — ROTO
v005
Clients review TASK DELIVERABLES.
Not abstract shots.
3. SHOT STATUS SHOULD BE DERIVED, NOT MANUALLY DRIVEN
Current shot statuses:
WAITING
IN_PROGRESS
INTERNAL_REVIEW
CLIENT_REVIEW
REVISIONS
APPROVED
FINAL
This is creating confusion because:
- shots are containers
- tasks are actual workflow units
Refactor shot statuses to be:
- simplified
- mostly derived automatically from task states
NEW SHOT STATUS MODEL
Reduce shot statuses to:
WAITING
IN_PROGRESS
IN_REVIEW
REVISIONS
COMPLETE
Definitions:
WAITING
No active tasks started.
IN_PROGRESS
At least one task is:
- TODO
- IN_PROGRESS
IN_REVIEW
At least one task is:
- INTERNAL_REVIEW
- CLIENT_REVIEW
REVISIONS
At least one task is:
- CHANGES
COMPLETE
All tasks are:
- DONE
IMPORTANT: Shot status should mostly be AUTO-CALCULATED from tasks.
NOT manually set constantly.
4. REMOVE "FINAL"
The current:
APPROVED
FINAL
is redundant/confusing.
Recommendation:
REMOVE FINAL.
Use:
DONE
at task level.
And:
COMPLETE
at shot level.
Cleaner. Much easier mentally.
5. TASK STATUS IS THE TRUE KANBAN STATUS
Task statuses should drive:
- kanban columns
- review state
- client review state
Task statuses:
TODO
IN_PROGRESS
INTERNAL_REVIEW
CLIENT_REVIEW
CHANGES
DONE
These statuses represent:
- actual workflow state
- actual review state
6. REVIEW FLOW RULES
Upload Version
When artist uploads new version:
Task → INTERNAL_REVIEW
Kanban card moves automatically:
IN_PROGRESS
→ INTERNAL_REVIEW
Supervisor Shares With Client
When clicking:
Share With Client
System should:
- mark latest version: isClientVisible = true
- set task status: CLIENT_REVIEW
Kanban updates automatically:
INTERNAL_REVIEW
→ CLIENT_REVIEW
Client Approves
Client approval should:
- approve ONLY the task
- NOT the entire shot
System:
Task.status = DONE
Version.approvalStatus = APPROVED
Kanban:
CLIENT_REVIEW
→ DONE
Client Requests Changes
System:
Task.status = CHANGES
Version.approvalStatus = NEEDS_CHANGES
Kanban:
CLIENT_REVIEW
→ CHANGES
7. SHOT COMPLETION RULE
A shot becomes:
COMPLETE
ONLY when:
ALL TASKS == DONE
Example:
SH010
├── Track → DONE
├── Roto → DONE
└── Comp → DONE
=> Shot COMPLETE
8. CLIENT PORTAL STRUCTURE
Refactor client portal to show:
Project
├── Shot
│ ├── Task
│ │ └── Latest Shared Version
Example UI:
SH010
COMP — v008
ROTO — v005
SH020
COMP — v003
This is MUCH clearer.
9. TASK DETAIL PAGE SHOULD BECOME PRIMARY REVIEW HUB
Task page should become:
- upload page
- review page
- approval page
- history page
Structure:
/tasks/[taskId]
Contains:
- task info
- latest version
- version history
- comments
- annotations
- approvals
- review actions
10. IMPORTANT IMPLEMENTATION NOTES
DO NOT:
- rewrite comment system
- rewrite annotation system
- rewrite player
JUST:
- move relationships from Shot → Task
- update logic
- update queries
- update review flow
This is mostly:
- schema cleanup
- workflow cleanup
- state cleanup
IMPORTANT PRODUCT PRINCIPLE
The production hierarchy should now be:
Project
→ Shot
→ Task
→ Version
→ Comments / Annotations / Approvals
NOT:
Project
→ Shot
→ Version
That distinction fixes nearly all current workflow inconsistencies.