Add a lightweight scheduling system to the existing FeedBack production tracking platform.

IMPORTANT: This is NOT enterprise scheduling. Do NOT build Microsoft Project. Do NOT build ShotGrid resource planning.

The goal is:

  • simple visual scheduling
  • artist workload visibility
  • drag-and-drop planning
  • lightweight production coordination

Think: “Trello timeline view for VFX tasks.”

The complexity level should match the existing kanban implementation.


CORE GOAL

Allow producers/supervisors to:

  • assign tasks to artists
  • schedule when tasks should be worked on
  • visualize artist workload
  • see upcoming deadlines
  • drag tasks around visually

The scheduling system should integrate directly with:

  • existing Tasks
  • existing Artists/Users
  • existing Due Dates
  • existing Kanban workflow

IMPORTANT PRODUCT PRINCIPLE

Scheduling is:

  • lightweight planning
  • not time tracking
  • not timesheets
  • not attendance management

We are ONLY planning:

  • who works on what
  • when
  • for roughly how long

NEW PAGE

Add:

/schedule

Add navigation item:

Schedule

SCHEDULING MODEL

Each task already has:

  • assignedArtistId
  • estimatedHours
  • dueDate

Add:

  • scheduledStartDate
  • scheduledEndDate

Optional:

  • scheduleNotes

ARTIST WORKLOAD ASSUMPTION

Assume:

8 working hours per day

Use estimatedHours to determine task duration visually.

Example:

16 estimated hours
= 2 scheduled work days

Keep calculations simple.


MAIN UI

The scheduling page should be a hybrid:

  • kanban
  • timeline/calendar

Layout:

Artists vertically
Dates horizontally

Example:

           Mon   Tue   Wed   Thu   Fri

Chris     [SH010 Comp------]

Sarah           [SH020 Roto--]

Mike                   [Asset Car Model----]

This should feel:

  • visual
  • fast
  • draggable
  • uncluttered

TASK CARDS

Each scheduled task block should show:

  • shot/asset code
  • task type
  • task status
  • due date
  • estimated hours

Optional:

  • latest version indicator
  • review status badge

Color coding:

  • TODO
  • IN_PROGRESS
  • INTERNAL_REVIEW
  • CLIENT_REVIEW
  • CHANGES
  • DONE

DRAG AND DROP

Use:

  • dnd-kit

Allow:

  • drag tasks between artists
  • resize tasks across days
  • move tasks along timeline

When dragged:

  • update scheduledStartDate
  • update scheduledEndDate
  • update assignedArtistId if moved to another artist row

Use optimistic updates.


SCHEDULING RULES

Simple rules only.

WARNING STATES

Highlight:

  • overdue tasks
  • tasks ending after due date
  • artist overload

Example overload:

Artist scheduled > 8h/day

Use visual indicators only. DO NOT block scheduling.


FILTERS

Add:

  • project filter
  • artist filter
  • task status filter

Optional:

  • department filter

TASK SOURCE

The schedule should ONLY display:

  • tasks with assigned artists OR
  • tasks with scheduled dates

Unscheduled tasks remain in kanban/backlog.


BACKLOG PANEL

Add optional side panel:

Unscheduled Tasks

Allow dragging tasks:

  • from backlog
  • onto artist schedule

This is VERY useful.


REVIEW INTEGRATION

Scheduling should integrate with review flow.

Example:

Task enters CLIENT_REVIEW
→ visually marked on schedule

Example:

Task enters CHANGES
→ warning badge appears

This creates production awareness.


KANBAN INTEGRATION

The schedule and kanban should share:

  • same task objects
  • same statuses
  • same assignments

Changing status in:

  • kanban
  • task page
  • review flow

should instantly reflect in schedule.

Example:

CLIENT_REVIEW
→ DONE

Task visually updates in schedule immediately.


DASHBOARD WIDGETS

Add:

  • Artist Utilization
  • Tasks Due This Week
  • Overloaded Artists
  • Upcoming Reviews

Simple summaries only.


UI REQUIREMENTS

The scheduler should feel:

  • modern
  • clean
  • cinematic
  • dark mode first

Inspiration:

  • Linear roadmap
  • Trello timeline
  • Notion timeline
  • Monday.com timeline

BUT: simpler and faster.

Avoid:

  • giant grids
  • enterprise clutter
  • complex dependencies
  • gantt-chart nightmares

IMPLEMENTATION PLAN

PHASE 1 — DATABASE

  1. Add scheduling fields to Task
  2. Add indexes for schedule queries
  3. Add task duration helpers

PHASE 2 — BASIC TIMELINE

  1. Build schedule page
  2. Artist rows
  3. Date columns
  4. Render scheduled tasks

PHASE 3 — DRAG/DROP

  1. Move tasks
  2. Resize durations
  3. Reassign artists
  4. Optimistic updates

PHASE 4 — BACKLOG

  1. Unscheduled task panel
  2. Drag from backlog to schedule
  3. Quick scheduling

PHASE 5 — POLISH

  1. Filters
  2. Overload indicators
  3. Review status badges
  4. Utilization summaries

IMPORTANT

Keep this system intentionally lightweight.

The ideal workflow should feel like:

Create task
→ Assign artist
→ Drag onto schedule
→ Artist uploads version
→ Review
→ Approve

That simplicity is the product advantage.