5.1 KiB
Add a lightweight scheduling system to the existing FeedBack production tracking platform.
IMPORTANT: This is NOT enterprise scheduling. Do NOT build Microsoft Project. Do NOT build ShotGrid resource planning.
The goal is:
- simple visual scheduling
- artist workload visibility
- drag-and-drop planning
- lightweight production coordination
Think: “Trello timeline view for VFX tasks.”
The complexity level should match the existing kanban implementation.
CORE GOAL
Allow producers/supervisors to:
- assign tasks to artists
- schedule when tasks should be worked on
- visualize artist workload
- see upcoming deadlines
- drag tasks around visually
The scheduling system should integrate directly with:
- existing Tasks
- existing Artists/Users
- existing Due Dates
- existing Kanban workflow
IMPORTANT PRODUCT PRINCIPLE
Scheduling is:
- lightweight planning
- not time tracking
- not timesheets
- not attendance management
We are ONLY planning:
- who works on what
- when
- for roughly how long
NEW PAGE
Add:
/schedule
Add navigation item:
Schedule
SCHEDULING MODEL
Each task already has:
- assignedArtistId
- estimatedHours
- dueDate
Add:
- scheduledStartDate
- scheduledEndDate
Optional:
- scheduleNotes
ARTIST WORKLOAD ASSUMPTION
Assume:
8 working hours per day
Use estimatedHours to determine task duration visually.
Example:
16 estimated hours
= 2 scheduled work days
Keep calculations simple.
MAIN UI
The scheduling page should be a hybrid:
- kanban
- timeline/calendar
Layout:
Artists vertically
Dates horizontally
Example:
Mon Tue Wed Thu Fri
Chris [SH010 Comp------]
Sarah [SH020 Roto--]
Mike [Asset Car Model----]
This should feel:
- visual
- fast
- draggable
- uncluttered
TASK CARDS
Each scheduled task block should show:
- shot/asset code
- task type
- task status
- due date
- estimated hours
Optional:
- latest version indicator
- review status badge
Color coding:
- TODO
- IN_PROGRESS
- INTERNAL_REVIEW
- CLIENT_REVIEW
- CHANGES
- DONE
DRAG AND DROP
Use:
- dnd-kit
Allow:
- drag tasks between artists
- resize tasks across days
- move tasks along timeline
When dragged:
- update scheduledStartDate
- update scheduledEndDate
- update assignedArtistId if moved to another artist row
Use optimistic updates.
SCHEDULING RULES
Simple rules only.
WARNING STATES
Highlight:
- overdue tasks
- tasks ending after due date
- artist overload
Example overload:
Artist scheduled > 8h/day
Use visual indicators only. DO NOT block scheduling.
FILTERS
Add:
- project filter
- artist filter
- task status filter
Optional:
- department filter
TASK SOURCE
The schedule should ONLY display:
- tasks with assigned artists OR
- tasks with scheduled dates
Unscheduled tasks remain in kanban/backlog.
BACKLOG PANEL
Add optional side panel:
Unscheduled Tasks
Allow dragging tasks:
- from backlog
- onto artist schedule
This is VERY useful.
REVIEW INTEGRATION
Scheduling should integrate with review flow.
Example:
Task enters CLIENT_REVIEW
→ visually marked on schedule
Example:
Task enters CHANGES
→ warning badge appears
This creates production awareness.
KANBAN INTEGRATION
The schedule and kanban should share:
- same task objects
- same statuses
- same assignments
Changing status in:
- kanban
- task page
- review flow
should instantly reflect in schedule.
Example:
CLIENT_REVIEW
→ DONE
Task visually updates in schedule immediately.
DASHBOARD WIDGETS
Add:
- Artist Utilization
- Tasks Due This Week
- Overloaded Artists
- Upcoming Reviews
Simple summaries only.
UI REQUIREMENTS
The scheduler should feel:
- modern
- clean
- cinematic
- dark mode first
Inspiration:
- Linear roadmap
- Trello timeline
- Notion timeline
- Monday.com timeline
BUT: simpler and faster.
Avoid:
- giant grids
- enterprise clutter
- complex dependencies
- gantt-chart nightmares
IMPLEMENTATION PLAN
PHASE 1 — DATABASE
- Add scheduling fields to Task
- Add indexes for schedule queries
- Add task duration helpers
PHASE 2 — BASIC TIMELINE
- Build schedule page
- Artist rows
- Date columns
- Render scheduled tasks
PHASE 3 — DRAG/DROP
- Move tasks
- Resize durations
- Reassign artists
- Optimistic updates
PHASE 4 — BACKLOG
- Unscheduled task panel
- Drag from backlog to schedule
- Quick scheduling
PHASE 5 — POLISH
- Filters
- Overload indicators
- Review status badges
- Utilization summaries
IMPORTANT
Keep this system intentionally lightweight.
The ideal workflow should feel like:
Create task
→ Assign artist
→ Drag onto schedule
→ Artist uploads version
→ Review
→ Approve
That simplicity is the product advantage.